costline.
Read-only pilot
BK
WorkspaceProduct costing

Product costing

Multi-level clarity. Every material, operation, and production version.

Sample dataCurrency: INRBOM alternative: 01Routing: R100Not reconciled with SAP
Total manufacturing cost
₹8,197.97/ EA
₹8,19,797.37 / batch
Material cost
₹6,748.67/ EA
Purchased materials, all BOM levels
Conversion cost
₹1,113.25/ EA
Labor, machine & setup
Production overhead
₹336.05/ EA
Material & conversion overheads

Cost composition

Per finished unit · INR
TOTAL / UNIT₹8,197.97
Material₹6,748.67
82.3% of total cost
Conversion₹1,113.25
13.6% of total cost
Overhead₹336.05
4.1% of total cost
10 BOM items·6 operations·3 BOM levels

Product & production

Valid version
Sample centrifugal pump
FG-1001

Centrifugal pump · CP 200

Finished / manufactured material
Production version
0001 · Standard assembly
Valid through
2027-12-31
Plant
1000 · Pune manufacturing
Lot-size range
1 – 10,000 EA

BOM cost breakdown

First-level components with costs rolled up from every level

Component / materialTypeQuantityMaterialConversionOverheadTotal cost
Pump housing assembly
SA-2100
Manufactured1.00 EA1,728.67375.0096.862,200.53
Impeller assembly
SA-2200
Manufactured1.00 EA1,320.00269.5071.941,661.44
Electric motor · 2.2 kW
RM-3301
Purchased1.00 EA3,450.000.000.003,450.00
Fastener set · M8
RM-3302
Purchased1.00 SET85.000.000.0085.00
Packaging kit
RM-3303
Purchased1.00 SET165.000.000.00165.00
5 first-level components · Assembly operations and overhead added separatelyAll values in INR