WorkspaceProduct costing
Product costing
Multi-level clarity. Every material, operation, and production version.
Sample dataCurrency: INRBOM alternative: 01Routing: R100Not reconciled with SAP
Total manufacturing cost
₹8,197.97/ EA
₹8,19,797.37 / batch
Material cost
₹6,748.67/ EA
Purchased materials, all BOM levels
Conversion cost
₹1,113.25/ EA
Labor, machine & setup
Production overhead
₹336.05/ EA
Material & conversion overheads
Cost composition
Per finished unit · INRTOTAL / UNIT₹8,197.97
Material₹6,748.67
82.3% of total cost
Conversion₹1,113.25
13.6% of total cost
Overhead₹336.05
4.1% of total cost
10 BOM items·6 operations·3 BOM levels
Product & production
Valid version
FG-1001
Centrifugal pump · CP 200
Finished / manufactured material
Production version
0001 · Standard assembly
Valid through
2027-12-31
Plant
1000 · Pune manufacturing
Lot-size range
1 – 10,000 EA
BOM cost breakdown
First-level components with costs rolled up from every level
| Component / material | Type | Quantity | Material | Conversion | Overhead | Total cost |
|---|---|---|---|---|---|---|
Pump housing assembly SA-2100 | Manufactured | 1.00 EA | 1,728.67 | 375.00 | 96.86 | 2,200.53 |
Impeller assembly SA-2200 | Manufactured | 1.00 EA | 1,320.00 | 269.50 | 71.94 | 1,661.44 |
Electric motor · 2.2 kW RM-3301 | Purchased | 1.00 EA | 3,450.00 | 0.00 | 0.00 | 3,450.00 |
Fastener set · M8 RM-3302 | Purchased | 1.00 SET | 85.00 | 0.00 | 0.00 | 85.00 |
Packaging kit RM-3303 | Purchased | 1.00 SET | 165.00 | 0.00 | 0.00 | 165.00 |
5 first-level components · Assembly operations and overhead added separatelyAll values in INR